Program update
Board Policy 6356 — Small Local Business Enterprise Program updated
Peralta Community College District has updated Board Policy 6356 to strengthen and modernize its Small Local Business Enterprise (SLBE) Program while reaffirming the District's longstanding commitment to supporting local businesses. The revised policy continues to promote meaningful opportunities for certified small local businesses through District contracting and enhances outreach, accountability, and stakeholder engagement. These updates are intended to ensure the program remains effective, transparent, and aligned with the District's procurement goals.
Click here to learn more about the policy update and the rationale behind these changes →Projects by campus
Berkeley City College
Milvia Street Expansion · Center Street Modernization
College of Alameda
Transportation Technology Center · Aviation Complex Modernization · Pickleball & Parking Lot Renovations
Laney College
Learning Resource Center · Theater Rehabilitation · Student Center Improvements
Merritt College
Child Development Center · Horticulture Buildings · Replace Bldgs. E&F — Kinesiology
News & construction updates
View all updates →Laney breaks ground on Learning Resource Center, Theater & Locker Rooms
Laney College
College of Alameda opens Transportation Technology Center
College of Alameda
Merritt College opens new Horticulture Complex
Merritt College
Invested in the community
Voter-approved Measure G funds are reinvested back into Northern Alameda County. Every project prioritizes local hiring, small business participation, and equitable access for all 30,000+ students.
- 25% small local business participation provision on bond-funded contracts
- Bidding preferences for SLBE-certified firms, set contract-by-contract
- Project Labor Agreement covering eligible Measure G work
Upcoming
Milvia Street Expansion — Ribbon Cutting
Recent
Laney College — Groundbreaking & Fab Lab Ribbon Cutting
PCCD Vendor Open House 2025
View flyer →Theater Rehabilitation — SLBE outreach
View flyer →Learning Resource Center — SLBE outreach
View flyer →Milvia Street Expansion — Groundbreaking
View flyer →Horticulture Complex — Groundbreaking
View flyer →Transportation Technology Center — Groundbreaking
View flyer →For ongoing outreach events, workshops, and matchmaking sessions, visit the Work with Us page or email buildperalta@peralta.edu.
Measure G · November 2018
About the bond measure
Approved by 76% of voters
During the November 2018 election, voters of Northern Alameda County overwhelmingly approved Measure G — the District's $800 million bond proposal to facilitate improvements to facilities and new construction across all four Peralta Colleges. It is the largest bond in PCCD history.
How the program is run
Measure G projects are monitored by an internal group of stakeholders who move the projects forward based on the totality of the program, as well as the instructional and service needs of each campus. The District has assembled an implementation and execution team to deliver against the approved bond program.
To run the program, the District has hired experts in construction, project management, and labor compliance — working to maximize efficiency and adherence to District policies and planning, including the District's Project Labor Agreement. The District will hire a Capital Program Director with procurement staff to perform the project accounting and financial operations for the Bond Program and ensure that progress payments and vendor payments are made in a timely manner and based upon supporting documentation and in compliance with standard accounting procedures and best practices for school construction.
How projects are selected
The Measure G program is built on the District-wide Facilities Master Plan, with priorities established by each campus working collaboratively to identify the projects that will be funded by the bond. The District guarantees that each college will receive funding in an amount no less than 10% of bond proceeds.
About the District
The Peralta Community College District (PCCD) is a collaborative community of colleges comprised of Berkeley City College, College of Alameda, and Laney and Merritt colleges in Oakland. The Peralta Colleges offer a dynamic multicultural learning environment with accessible, high-quality educational programs and services — including two-year degrees, certificates, and university transfer programs — to more than 30,000 students. PCCD is also home to award-winning Peralta TV (Comcast ch. 27/28, AT&T ch. 99) and public radio KGPC-LP 96.9 FM.
Chancellor's welcome
Dr. Tammeil Gilkerson
Chancellor · Peralta Community College District
"I call Oakland my home, and my roots run deep in the East Bay. Within Peralta, I see a wealth of brilliance and remarkable progress happening at the colleges and across the district. I'm eager to play a role in enhancing a multitude of outstanding programs and services, all guided by a commitment to equity and social justice."
Dr. Gilkerson previously served as President of Evergreen Valley College in San José and as President of Laney College from 2017 to 2020. With nearly two decades of community college leadership experience, she has been a consistent advocate for student success, equity, and social justice in the East Bay.
The four campuses

Berkeley City College
2050 Center St, Berkeley, CA
Urban campus in downtown Berkeley offering transfer programs and career education with strong connections to UC Berkeley and Bay Area employers.

College of Alameda
555 Ralph Appezzato Memorial Pkwy, Alameda, CA
Located on a former Naval Air Station, known for aviation maintenance technology, auto/diesel technology, and allied health programs.

Laney College
900 Fallon St, Oakland, CA
The largest college in the District, offering over 100 programs and serving as a hub for workforce development and the construction trades MC3 pre-apprenticeship training program.

Merritt College
12500 Campus Dr, Oakland, CA
Nestled in the Oakland hills, known for environmental horticulture, child development, kinesiology, and a renowned farm lab.
Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.
Berkeley City College3 projectsProject list
Milvia Street Expansion
A new six-story building at Milvia and Center Streets adding classrooms, art studios, learning resource facilities, and expanded student and faculty support areas.
$93.6M budget · 95% expended · CM: Kitchell CEM
Center Street Modernization
Renovation of the existing 2050 Center Street building, beginning after relocations to the new Milvia building are complete. Adds STEM labs and classrooms, expands the library, and improves faculty office spaces.
$5.0M budget · 1% expended
Site Rehabilitation, Security and Infrastructure
Site improvements, infrastructure and security upgrades across the Berkeley City College campus, including pathways, utility systems and access control.
$1.2M budget · 59% expended · CM: Kitchell CEM
Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.
College of Alameda4 projectsTransportation Technology Center
A new consolidated facility for the Auto and Diesel Technology programs, incorporating training for alternative fuels including fuel cells and hybrids. Funded with a blend of State and local Measure G bond funds.
$16.2M budget · 94% expended · CM: Roebbelen
Aviation Complex Modernization
Modernizes the aviation maintenance technology complex on one acre of District-owned property adjacent to Oakland Airport — one of only two such programs in the Bay Area.
$44.8M budget · 6% expended · CM: Cumming Management Group
Pickleball & Parking Lot Renovations
Conversion of the existing tennis courts to dual-use tennis and pickleball courts, together with parking lot improvements adding shade canopies, solar panels and ADA accessible parking stalls. Added to the bond list by the April 14, 2026 revision with a $3.0M budget; design is underway.
$3.0M budget · 3% expended · Design: DSK Architects
Security and Infrastructure
Security and infrastructure upgrades across the College of Alameda campus, including site utilities, elevators and access systems.
$2.1M budget · 100% expended · Design: LPAS
Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.
Laney College4 projectsLearning Resource Center
A new Learning Resource Center serving as the gateway to the campus from Parking Lot A along 7th Street. Construction began in April 2025. Funded with a blend of State and local Measure G bond funds.
$77.7M budget · 7% expended · CM: Jacobs Project Management
Theater Rehabilitation
Modernization of the Theater building to better serve current student needs — increased seating capacity, new theater and rehearsal support spaces, more effective teaching environments, and comprehensive accessibility improvements. Funded with a blend of State and local Measure G funds.
$32.8M budget · 23% expended · CM: Jacobs Project Management
Central Utility Plant
Replacement of existing chillers, boilers, and cooling towers; repair or replacement of associated pumps, piping, and valves; and a new Building Automation System. New chillers and boilers locate in the existing Central Plant in Building E; new cooling towers in a new enclosure south of Building F, with new piping connecting back to Building E.
$17.9M budget · 96% expended · CM: Swinerton Management
Student Center Improvements
Modernization of the existing student center facility, cafeteria and associated spaces. The April 14, 2026 revision added fire alarm modernization to the scope, moving that work across from the Campus-Wide Fire Alarm Modernization project and bringing the budget to $10.5M. Construction is under way.
$10.5M budget · 14% expended · CM: Jacobs Project Management
Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.
Merritt College3 projectsChild Development Center
A new permanent facility to support demonstration, lab program, instructional, and administrative space for an educational program designed for TK/Pre-K children. Located on the Merritt campus for safe and efficient direct-auto access for drop-off and pick-up. Funded with a blend of State and local Measure G bond funds.
$39.3M budget · 54% expended · CM: Kitchell CEM
Horticulture Buildings
Replaces the existing horticulture facility. Existing large lecture rooms are no longer suited to the instructional program; new laboratory and lecture spaces will be configured to support contemporary horticulture techniques and practices. Funded with a blend of State and local Measure G funds.
$29.9M budget · 93% expended · CM: Kitchell CEM
Replace Bldgs. E&F — Kinesiology and Physical Training
Replacement of the existing locker room and gym buildings to provide open spaces adequately equipped and sized for wellness and fitness programming. Funded with local Measure G bond funds.
$43.5M budget · 0% expended · Design: JKAE Architects
All campuses
Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.
4102 – Furniture, Fixtures and Equipment
$15.0M budget · 1% expended
4105 – Information Technology Replacement
$31.0M budget · 54% expended
4110 – Small Capital Improvements
$25.0M budget · 29% expended
4111 – Demo (Demolition of obsolete facilities)
$10.0M budget · 0% expended
4998 – Program Management
$25.4M budget · 45% expended
4801 – Site Rehabilitation, Security and Infrastructure
$1.2M budget · 59% expended
4802 – Milvia Street Expansion
$93.6M budget · 95% expended
4201 – Security and Infrastructure
$2.1M budget · 100% expended
4202 – Transportation Technology Center
$16.2M budget · 94% expended
4204 – ADA and Site Improvements
$5.8M budget · 5% expended
4206 – New Classroom Building
$35.0M budget · 0% expended
4208 – Aviation Complex Modernization
$44.8M budget · 6% expended
4209 – Elevator Upgrades
$1.5M budget · 48% expended
4212 – Pickleball and Parking Lot Renovations
$3.0M budget · 3% expended
4501 – Laney Campus Rehabilitation (CM and planning services for theatre and locker room project)
$0.5M budget · 100% expended
4502 – Locker Room Rehabilitation - Portable Modulars Swing Space
$6.3M budget · 78% expended
4503 – Furniture, Fixtures and Equipment
$1.4M budget · 88% expended
4506 – Locker Room Rehabilitation
$16.1M budget · 17% expended
4508 – Elevator Upgrades
$3.8M budget · 32% expended
4509 – Roofing Improvements
$4.1M budget · 56% expended
4510 – Learning Resource Center
$77.7M budget · 7% expended
4511 – Central Utility Project
$17.9M budget · 96% expended
4514 – Theater Rehabilitation
$32.8M budget · 23% expended
4515 – Water Main Relocation
$3.0M budget · 90% expended
4516 – Student Center Improvements
$10.5M budget · 14% expended
4517 – Campus-Wide Fire Alarm Modernization
$14.1M budget · 6% expended
4518 – Small Capital Improvements
$7.2M budget · 98% expended
4519 – Fab Lab Relocation
$2.1M budget · 100% expended
4601 – Site Improvements, Security and Infrastructure
$5.3M budget · 58% expended
4602 – Horticulture Buildings
$29.9M budget · 93% expended
4604 – ADA and Site Improvements
$7.6M budget · 5% expended
4606 – Science and Allied Health Building Classrooms, Labs and Center for Social Justice and Civic Engagement
$8.6M budget · 9% expended
4608 – Child Development Center
$39.3M budget · 54% expended
4609 – Replace Bldgs. E and F - Kinesiology and Physical Training
$43.5M budget · 0% expended
4610 – Elevator Upgrades
$1.8M budget · 66% expended
4611 – Substations B and D
$16.4M budget · 6% expended
4612 – Secondary Power Substation C Replacement
$4.4M budget · 84% expended
Featured
Board Approved Bond List
Related resources
Complete list of Measure G projects
The official, Board Approved list of all projects approved under the Measure G bond.
Documents & reports
Financial Audit Statements & Performance Audit Reports
Independent annual financial and Proposition 39 performance audits of the Measure G bond program, published by the District
Facilities Update — August 25, 2026 Board Meeting
Capital projects portfolio, Facilities Master Plan progress, Bond List Revisions #3 and #4, and the August 2026 bond sale
Bond List Revision — April 14, 2026
Revisions to the Measure G project list · effective April 14, 2026
Citizens' Bond Oversight Committee (CBOC)
Independent oversight, agendas, minutes, and annual reports — peralta.edu/cboc
Small Local Business Enterprise Program (SLBE)
Board Policy 6356 and Administrative Procedure 6356, plus certification directories and program guidance
Project Labor Agreement
PLA covering eligible bond-funded capital improvement projects, plus the 2024 5-year extension and 2025 side letter
Facilities Master Plan (FTMP) — BOT March 13 update
The District-wide long-range capital planning document. Projects are selected and prioritized through this plan.
Measure G Bond Resolution
Authorizing language for the $800M bond approved by 76% of voters in November 2018
Local Business Outreach
As part of the District's commitment to ensure voter-approved bond money is reinvested back into the local community, the District and Bond Program Management provide extensive local business outreach for the Capital Program's projects. There are ongoing local business outreach workshops, technical assistance trainings, small business webinars, and community forums.
Register to do business with Peralta
Step 1 of 2
Peralta Supplier Portal
Register with the District directly to be added as an approved supplier. Required for invoicing, payment, and any contract work with Peralta.
Register on the Supplier Portal →Step 2 of 2
Bid opportunities
Browse current RFPs, RFQs, and bid packages on PlanetBids, the District's e-procurement platform. Registered vendors receive automated notifications of new opportunities.
Browse bid opportunities →How to get involved
Small Local Business Enterprise Program (SLBE)
25% SLBE utilization provision on bond-funded contracts. Covers eligibility, certification agencies, and how contract-by-contract bidding preferences work. See Board Policy BP 6356 and Administrative Procedure AP 6356.
Learn more →Business Outreach
Workshops, technical assistance trainings, webinars, and community forums. Current and recent events including the 2025 PCCD Vendor Open House.
See events →Project Labor Agreement
The District's PLA supports labor stability and workforce development on eligible Measure G work — coordinating with building trades pathways and Laney's MC3 training program (est. 2025). 5-year extension executed 2024.
View the PLA →Small Business Advisory Council
An advisory body that helps guide the District's small-business engagement and outreach strategy, providing community and industry input into how local firms participate in the Measure G program.
Learn more →Resources
Purchasing Department ↗
For RFPs, RFQs, bids, vendor registration, and contract questions, visit the PCCD Purchasing Department site.
peralta.edu/purchasing →Vendor Registration ↗
Register on PlanetBids — the District's e-procurement platform — to receive automated notifications of upcoming bids and RFPs.
PlanetBids vendor portal →RFP / RFQ / Bids ↗
Browse all active solicitations including construction bids, professional services RFQs, and other opportunities on PlanetBids.
View active bids →About the program
The Peralta Community College District is committed to ensuring equal opportunity and equitable treatment in the awarding and administration of its public contracts. To support that commitment, the District has established an annual overall program goal of 25% participation by Small Local Business Enterprises (SLBE) on bond-funded contracts.
How bidding preferences work
To facilitate opportunities for small local businesses, the District determines bidding preferences on a contract-by-contract basis. The preference is used only for computation purposes — to determine the winning bidder — and the contract is awarded at the actual bid amount.
Whether a preference applies, and at what level, depends on the specific solicitation. Please review the guidelines below to see if your firm qualifies for the preference on a given contract.
Eligibility
Eligibility is determined based on three factors:
Criterion 1
Scope of work or trade
The work being performed must align with eligible scopes recognized under the SLBE program.
Criterion 2
Firm revenue size
The firm must meet the program's revenue thresholds, which vary by industry and scope.
Criterion 3
Business location
The firm must be located within the District's designated market area, as defined in Administrative Procedure 6356.
Certification agencies
Small and local businesses can certify through the agencies below. A current certification helps establish SLBE eligibility and lists your firm in public supplier databases. Select an agency to begin its certification or supplier search.
Small Local & Emerging Business (SLEB) supplier database
CA Department of General Services
Cal eProcure — Small Business (SB) & Disabled Veteran Business Enterprise (DVBE) certification search
California Unified Certification Program
Disadvantaged Business Enterprise (DBE) certification — represents 10 California certifying agencies
Local & Small Local Business Enterprise (LBE/SLBE) certification
Small Local Business Enterprise certification application
US Small Business Administration
Federal certification search — 8(a), HUBZone, WOSB, SDVOSB
Policy documents & resources
BP 6356 — Small Local Business Enterprise Program
Board Policy · Board-approved
AP 6356 — Small Local Business Enterprise Program
Administrative Procedure · Board-approved
Questions about the program?
For more information on the Capital Program's Local Business Outreach Program, email buildperalta@peralta.edu.
See upcoming outreach events →Peralta Community College District has updated Board Policy and Administrative Procedure 6356, governing the District's Small Local Business Enterprise (SLBE) Program. Following the District's shared-governance review process, the revised Board Policy was approved by the Board of Trustees on February 10, 2026.
The updated program continues Peralta's longstanding commitment to creating meaningful opportunities for small and local businesses and to supporting economic activity within our surrounding communities. The program maintains a 25% SLBE utilization provision for covered contracts and provides 3% to 5% bidding preferences for bidders that commit to SLBE participation above the established utilization requirement. Under the revised policy, these provisions apply to covered construction, professional services, and supply contracts valued at $1 million or more.
The updated policy continues to encourage meaningful participation by certified small local businesses in District contracting while enhancing program accountability, outreach, stakeholder engagement, and technical assistance, while continuing to prioritize firms with strong ties to the communities the District serves. Eligibility criteria, including the designated market area, are set out in Board Policy 6356 and Administrative Procedure 6356.
Read the policy: Board Policy 6356 (PDF) · Administrative Procedure 6356 (PDF)
Peralta remains committed to increasing the participation and capacity of small local businesses in District contracting and to ensuring that the District's capital investments continue to generate opportunities within the communities we serve.
Related resources
Learn more about the SLBE Program
For information about SLBE eligibility, program requirements, upcoming contracting opportunities, and assistance available to local businesses, please visit the Build Peralta Small Local Business Enterprise Program webpage.
Visit the Small Local Business Enterprise Program →What it is
Build Peralta Academy is a nine-session workshop and technical-assistance bootcamp that includes instruction by industry subject-matter experts. The workshops are created to provide support and help ensure success for small businesses working — or interested in working — on the Measure G bond program, as well as for Peralta students interested in construction and design projects.
Sessions are conducted in either lecture or panel format, in person or virtually. Attendees who participate in 90% of the courses in one series will receive a Certificate of Completion.
Three goals: Inform · Educate · Connect
Inform
Sessions are led by subject-matter experts, providing critical information to participants.
Educate
Knowledge-transfer sessions are each two hours, in panel or workshop format.
Connect
Since sessions are led by key officials from the District and PMO, participants meet project and district leaders.
New Academy content in development. An updated Build Peralta Academy series is being prepared for the Measure G program. Session topics, schedule, and registration will be posted here. The session list below is archived from prior series. Presentation files are being restored — to request a copy of any session's materials in the meantime, email buildperalta@peralta.edu.
Archived sessions (prior series)
Topics covered by past Build Peralta Academy sessions are listed below. This list will be replaced as new content is published.
How to do business and pre-qualification with Peralta Colleges
Build Peralta Academy session
The Art of Estimating and Cost Savings 101
Build Peralta Academy session
Managing Cashflow in the Construction Industry
Build Peralta Academy session
How to Create Award-Winning Proposals
Build Peralta Academy session
How to Bid Informally and Formally (including CUPCCAA)
Build Peralta Academy session
How to obtain Bonding and Insurance
Build Peralta Academy session
PCCD Small Business Program & Local Small Business Certification
Build Peralta Academy session
Scheduling Basics
Build Peralta Academy session
Change Management: How to Manage Scope, Schedule, Budget
Build Peralta Academy session
Small Business Plan Concept Presentation
Build Peralta Academy session
Small Business Resource Panel
Build Peralta Academy session
SBA Update — Surety Bond Guarantee, PPP and Loans
Build Peralta Academy session
Developing A Safety Program During COVID-19 Era
Build Peralta Academy session
Follow Build Peralta Academy at #buildperaltaacademy.
Local Business Outreach
As part of the District's commitment to ensure that voter-approved bond money is reinvested back into the local community, the District and Bond Program Management provide extensive local business outreach for the Capital Program's projects. There are ongoing local business outreach workshops, technical assistance trainings, small business webinars, and community forums. For more information, email buildperalta@peralta.edu.
Upcoming events
Past events
Theater Rehabilitation — SLBE outreach
View details →Learning Resource Center — SLBE outreach
View flyer →PCCD 2022 Update — 6 Months Look Ahead Virtual Outreach
Download PDF →PCCD Matchmaking — Berkeley CC West (multiple sessions)
October 2021 Virtual Business Outreach
Download Q&A PDF →Build Peralta Virtual Business Outreach
Download PDFs →Want to host or attend an outreach event?
Contact the Capital Program's Local Business Outreach team at buildperalta@peralta.edu for upcoming events, matchmaking opportunities, and project-specific SLBE outreach.
District commitment
The District is committed to delivering Measure G construction through a Project Labor Agreement that supports fair wages, safe job sites, labor stability, and — critically — pathways into the building trades for local residents and Peralta students. The PLA is a core part of how the program returns value to the community it serves.
About the PLA
The Peralta Community College District utilizes a Project Labor Agreement (PLA) on eligible bond-funded capital improvement projects to support high-quality construction delivery, labor stability, and workforce development across PLA-covered work.
Workforce development
The PLA coordinates workforce participation through building and construction trades pathways, established systems, and state-recognized training programs — including the Laney College Multi-Craft Core Curriculum (MC3) program established in 2025. Local workforce development organizations play an important role in supporting apprenticeship readiness and construction career pathways.
PLA documents
PLA Agreement
Full Project Labor Agreement document
2024 5-Year Extension
Chancellor's letter to BTC · June 2024
2025 PLA Side Letter — Arbitrators
Executed May 2025 · all parties
MC3 Training Program — Laney College
The Multi-Craft Core Curriculum (MC3) is a state-recognized pre-apprenticeship training program that prepares workers for careers in the building and construction trades. Established at Laney College in 2025, MC3 graduates have a recognized pathway to registered apprenticeship in the trades that participate in the District's PLA.
Purpose
The Small Business Advisory Council provides community and industry input into the District's small-business engagement strategy for the Measure G Capital Program. The Council advises on outreach, technical-assistance priorities, and ways to strengthen participation by local firms — helping ensure the program reflects the businesses and communities it serves.
What the Council does
Advise
Offers guidance on outreach and engagement so local small businesses can find and pursue Measure G opportunities.
Connect
Bridges the District, the PMO, and the local business community to surface barriers and share opportunities.
Inform
Helps shape program materials and technical-assistance offerings for the local small-business community.
Get involved
Meeting schedules, membership, and participation details will be posted here. To express interest or learn more, contact the program at buildperalta@peralta.edu or call (510) 587-7828.
Related resources
Business Outreach
Workshops, trainings, and community forums
Send us a message
Total authorized
$809.93MMeasure G · incl. unallocated bond interest
Funds expended
$257.57M31.8% of total authorized
Funds encumbered
$153.56MContracted, not yet spent
Remaining balance
$398.81MAvailable for future projects
Dashboard sections
Measure G by campus Budgets and expenditures · inception through March 31, 2026
Bond allocation breakdown $809.93M total
Encumbered funds are the undrawn balance of contracts already awarded. Uncommitted funds are not yet under contract.
Project Budget Tracker Measure G funds only
Measure G Budget — Bond List (August 25, 2026)
Measure G Expensed — inception through March 31, 2026
Audit & report archive
Financial Audit Statements & Performance Audit Reports
Independent annual audits published by the District
CBOC Committee Annual Reports
Findings published by the Citizens' Bond Oversight Committee
Facilities & Technology Master Plans
Long-range capital planning documents
Citizens' Bond Oversight Committee
Jeff Cambra, Chair
At-large member
Joby Thomas, Vice Chair
Senior citizens’ organization
Mark McComb
At-large member
Tarrell Gamble
Business organization
Benjamin Scott
Community college supporter
Vacant
Taxpayers’ organization
Vacant
Student member
Meetings, agendas & minutes
The CBOC meets quarterly in public session. Meeting dates, agendas and minutes are published and kept current by the District.
CBOC agendas & minutes
peralta.edu/cboc/agendas-minutes
What is Build Peralta?
Build Peralta is the official public-facing website for the Peralta Community College District's capital construction program — funded by the voter-approved Measure G general obligation bond. The site exists to make visible how bond dollars are being spent, where construction is happening, and which projects are underway, for the community, taxpayers, students, and business partners who help deliver the work.
This site is maintained by the District's Department of General Services and the Project Management Office (PMO), with independent oversight from the Citizens' Bond Oversight Committee (CBOC).
Why it matters
In November 2018, voters approved Measure G — an $800 million bond — by an overwhelming 76% majority. It is the largest taxpayer-funded investment in PCCD's history, supporting facility improvements and new construction at Berkeley City College, College of Alameda, Laney College, and Merritt College. The District guarantees that each college will receive funding in an amount no less than 10% of bond proceeds.
The bond came with a commitment to transparency: every dollar spent is reviewed by the CBOC and published here for the public to see. Build Peralta is how that commitment shows up day to day — schedules, budgets, project status, board-approved scope, and contracting opportunities, all in one place.
How the program is governed
Projects are monitored by an internal group of District stakeholders working from the District-wide Facilities Master Plan, with priorities established collaboratively by each campus. To deliver the work, the District has hired experts in construction, project management, and labor compliance — a Director of Capital Projects leads the team and works in compliance with the District's Project Labor Agreement.
How to use this site
Most people come here for one of four things: to see what's being built and when (Projects, Schedules), to understand how the bond dollars are being spent (Financial Dashboard, Reports), to work with the District (Work with Us), or to follow news and milestones (News & Updates). The FAQ answers common questions, and the Contact page lists who to call for what.

Board of Trustees · Voter-elected, 7 members
Office of the Chancellor and District Leadership
Dr. Tammeil Gilkerson · Chancellor
Greg Nelson · Deputy Chancellor / Chief Operating Officer
Department of General Services (DGS)
Amy Marshall · Director of Capital Projects
Project Management Office (PMO)
AECOM
Program oversight, design and construction
Lowe Consulting Group
SLBE, community outreach, PLA & compliance
VM3 Consulting
Program controls & reporting
Current construction management
Kitchell CEM
Jacobs Project Management
Roebbelen
Cumming Management Group
Swinerton Management
How oversight works
The Citizens' Bond Oversight Committee (CBOC) is independent of the District organization shown above. It is appointed by the Board of Trustees but operates as a separate oversight body — reviewing expenditures, auditing reports, and publishing findings to the public. Both the CBOC and the Board of Trustees are explained in their own sections of this site.
Citizens' Bond Oversight Committee
Independent review of all Measure G expenditures →
Board of Trustees
Elected governing body of the District →
What the CBOC does
State law (Proposition 39) requires every California school district that passes a 55% threshold general obligation bond to form a Citizens' Bond Oversight Committee. The CBOC's role is to ensure that all bond proceeds are spent only for projects authorized by voters — not on salaries, pensions, or operating expenses.
Operating separately from the District organization, the CBOC meets quarterly in public sessions, reviews independent financial and performance audits, and publishes its agendas, minutes, and annual reports at peralta.edu/cboc. Meetings are open to the public; members of the community are encouraged to attend.
How to participate
CBOC members are appointed by the Board of Trustees from designated categories including taxpayers' associations, business organizations, senior citizens' groups, students, and members of the community at large. If you're interested in serving, see current members and openings on the District site.
View CBOC annual reports →
About the Board
The PCCD Board of Trustees is composed of seven elected members representing the six cities served by the District: Alameda, Albany, Berkeley, Emeryville, Oakland, and Piedmont. Two student trustees also serve in advisory roles.
The Board sets District policy, approves the budget, awards contracts above statutory thresholds, and ratifies major actions related to the Measure G bond program — including approval of project lists, bid awards, and master plans.
Trustees by area
Area 1
Bill Withrow
Area 2
Paulina Gonzalez-Brito
Area 3
Louis Quindlen
Area 4
Nicky González Yuen
Area 5
Cindi Napoli-Abella Reiss
Area 6
Dyana Delfín Polk
Area 7
Sheweet Yohannes
Student Trustee
Harsheet Subedi
Student Trustee
Jazlyn Tandel
The current roster and a trustee-area boundary map are on the District Board of Trustees site.
Meeting information
Board meetings are held publicly and are streamed live. Full meeting agendas, supporting documents, and minutes are posted on the District's BoardDocs site, which is the official record for all Board actions.
Visit BoardDocs →
| Project | Measure G Funding | State Funding |
|---|---|---|
| College of Alameda | ||
| 4201– Security and Infrastructure | $2,215,799 | — |
| 4202– Transportation Technology Center | $15,704,449 | $16,569,000 |
| 4203– Furniture, Fixtures and Equipment | $1,001,528 | — |
| 4204– ADA and Site Improvements | $5,804,406 | — |
| 4205– Information Technology Replacement | $100,932 | — |
| 4206– New Classroom Building | $35,001,057 | — |
| 4207– Campus-Wide Rehabilitation (Keyless Entry Study) | $42,255 | — |
| 4208– Aviation Complex Modernization | $44,833,343 | $14,648,000 |
| 4209– Elevator Upgrades | $1,506,962 | — |
| 4210– Roofing Improvements | $2,860,772 | — |
| 4211– Science Annex HVAC Rehabilitation | $27,471 | — |
| 4212– Pickleball and Parking Lot Renovations | $3,000,000 | — |
| 4299– College of Alameda Campus Contingency | $1,000,000 | — |
| College of Alameda — subtotal | $113,098,974 | $31,217,000 |
| Berkeley City College | ||
| 4801– Site Rehabilitation, Security and Infrastructure | $1,157,210 | — |
| 4802– Milvia Street Expansion | $93,284,099 | — |
| 4803– Center Street Modernization | $5,004,769 | — |
| 4804– Campus-Wide Rehabilitation (Keyless Entry Study) | $105,061 | — |
| 4805– Information Technology Replacement | $2,109,424 | — |
| 4899– Berkeley City College Campus Contingency | $1,000,000 | — |
| Berkeley City College — subtotal | $102,660,562 | — |
| Laney College | ||
| 4501– Laney Campus Rehabilitation (CM and planning services for theatre and locker room project) | $464,900 | — |
| 4502– Locker Room Rehabilitation - Portable Modulars Swing Space | $6,363,446 | — |
| 4503– Furniture, Fixtures and Equipment | $1,466,012 | — |
| 4504– ADA and Site Improvements | $5,000,000 | — |
| 4505– Information Technology Replacement | $1,528,285 | — |
| 4506– Locker Room Rehabilitation | $16,123,668 | — |
| 4507– Campus-Wide Rehabilitation (Keyless Entry Study) | $59,668 | — |
| 4508– Elevator Upgrades | $3,859,044 | — |
| 4509– Roofing Improvements | $3,416,351 | — |
| 4510– Learning Resource Center | $78,032,167 | $24,417,000 |
| 4511– Central Utility Project | $18,193,830 | — |
| 4512– BEST Center Modernization | $200,000 | — |
| 4513– Building A and B Renovation | $8,000,000 | — |
| 4514– Theater Rehabilitation | $33,219,255 | $7,999,000 |
| 4515– Water Main Relocation | $3,007,040 | — |
| 4516– Student Center Improvements | $11,758,750 | — |
| 4517– Campus-Wide Fire Alarm Modernization | $14,159,405 | — |
| 4518– Small Capital Improvements | $7,255,724 | — |
| 4519– Fab Lab Relocation | $2,165,820 | — |
| 4599– Laney College Campus Contingency | $1,000,000 | — |
| Laney College — subtotal | $215,273,363 | $32,416,000 |
| Merritt College | ||
| 4601– Site Improvements, Security and Infrastructure | $5,309,479 | — |
| 4602– Horticulture Buildings | $28,998,676 | $9,789,000 |
| 4603– Furniture, Fixtures and Equipment | $1,012,551 | — |
| 4604– ADA and Site Improvements | $7,590,272 | — |
| 4605– Information Technology Replacement | $1,632,312 | — |
| 4606– Science and Allied Health Building Classrooms, Labs and Center for Social Justice and Civic Engagement | $8,634,569 | — |
| 4607– Campus-Wide Rehabilitation (Keyless Entry Study) | $50,706 | — |
| 4608– Child Development Center | $39,594,349 | $6,128,000 |
| 4609– Replace Bldgs. E and F - Kinesiology and Physical Training | $43,459,902 | $22,445,000 |
| 4610– Elevator Upgrades | $1,781,925 | — |
| 4611– Substations B and D | $16,384,968 | — |
| 4612– Secondary Power Substation C Replacement | $4,592,025 | — |
| 4699– Merritt College Campus Contingency | $1,000,000 | — |
| Merritt College — subtotal | $160,041,734 | $38,362,000 |
| Districtwide | ||
| 4101– District Service Center Rehabilitation | $3,984,678 | — |
| 4102– Furniture, Fixtures and Equipment | $15,016,680 | — |
| 4103– Fixtures, Furniture, and Equipment and Information Technology | $4,054,908 | — |
| 4104– ADA and Site Improvements | $21,000,000 | — |
| 4105– Information Technology Replacement | $31,325,315 | — |
| 4106– Signage and Wayfinding | $2,501,385 | — |
| 4107– Library Equipment and Books | $18,264 | — |
| 4108– Emergency Phone Project – Phase 2 | $527,917 | — |
| 4109– Energy and Sustainability | $50,002,651 | — |
| 4110– Small Capital Improvements | $24,942,689 | — |
| 4111– Demo (Demolition of obsolete facilities) | $10,000,000 | — |
| 4112– Vehicles | $1,000,000 | — |
| 4113– Districtwide Utility Master Plan | $3,000,000 | — |
| 4114– Districtwide Access Controls | $3,000,000 | — |
| 4998– Program Management | $19,521,016 | — |
| 4999– Program Contingency | $28,957,476 | — |
| Districtwide — subtotal | $218,852,979 | — |
| Grand Total · Measure G + State Funding | $809,927,612 | $101,995,000 |
Each college is guaranteed a minimum 10% allocation of Measure G bond proceeds. Measure G figures are board-approved budgets from the August 25, 2026 bond list revision. For related program documents, see Reports & Audits.
Project phasing from the District’s Master Program Schedule, May 2026 update. Schedules are subject to change.
About the bond
Where the money goes
Projects
Doing business with Peralta
Oversight & accountability
Community
← All projects · View on program schedule · Bond list
About this project
Photos & renderings
Milestones
Project team
Figures are Measure G expenditures inception through March 31, 2026. Team reflects firms under contract on the project.
buildperalta.org/archive). To bring an item back, re-add its link to the relevant page or menu.
Archived items
Build Peralta Academy
Nine-session small-business bootcamp · 13 archived session topics listed; presentation files pending restore · Archived June 2026
More archived items will appear here as content is retired.