Measure G · Bond Program

Bringing positive change to our community

An $800 million voter-approved bond to build, modernize, and expand facilities at the four Peralta Colleges — for the more than 30,000 students they serve.

$800MMeasure G bond
4Peralta Colleges
30,000+Students served
76%Voter-approved · Nov 2018

Program update

Board Policy 6356 — Small Local Business Enterprise Program updated

Peralta Community College District has updated Board Policy 6356 to strengthen and modernize its Small Local Business Enterprise (SLBE) Program while reaffirming the District's longstanding commitment to supporting local businesses. The revised policy continues to promote meaningful opportunities for certified small local businesses through District contracting and enhances outreach, accountability, and stakeholder engagement. These updates are intended to ensure the program remains effective, transparent, and aligned with the District's procurement goals.

Click here to learn more about the policy update and the rationale behind these changes →

Berkeley City College

Milvia Street Expansion · Center Street Modernization

College of Alameda

Transportation Technology Center · Aviation Complex Modernization · Pickleball & Parking Lot Renovations

Laney College

Learning Resource Center · Theater Rehabilitation · Student Center Improvements

Merritt College

Child Development Center · Horticulture Buildings · Replace Bldgs. E&F — Kinesiology

News & construction updates

View all updates →
GroundbreakingOct 2025

Laney breaks ground on Learning Resource Center, Theater & Locker Rooms

Laney College

MilestoneSep 2025

College of Alameda opens Transportation Technology Center

College of Alameda

MilestoneSep 2025

Merritt College opens new Horticulture Complex

Merritt College

Invested in the community

Voter-approved Measure G funds are reinvested back into Northern Alameda County. Every project prioritizes local hiring, small business participation, and equitable access for all 30,000+ students.

  • 25% small local business participation provision on bond-funded contracts
  • Bidding preferences for SLBE-certified firms, set contract-by-contract
  • Project Labor Agreement covering eligible Measure G work

News & Updates

Construction updates

The latest milestones, groundbreakings, and progress from across all four Peralta campuses.

CommunityJune 23, 2026

Volunteers sought for the Citizens' Bond Oversight Committee

The District is recruiting community members for its Citizens' Bond Oversight Committee — the independent body that reviews Measure G spending and reports annually to the public on how bond funds are used.

District-wide

Read more →
GroundbreakingOctober 28, 2025

Laney College breaks ground on Learning Resource Center, Theater & Locker Room projects

Laney College and District leadership celebrated the groundbreaking of three Measure G projects — a new Learning Resource Center (Noll & Tam / Thompson Builders), a Theater Rehabilitation, and locker room renovations. The new LRC will serve as a gateway to campus from 7th Street.

Laney College

Read more →
MilestoneSeptember 30, 2025

College of Alameda opens new Transportation Technology Center

The District cut the ribbon on the $36M, 39,520 sf Transportation Technology Center, which brings the Automotive Technology, Auto Body & Paint, and Diesel Mechanics programs together under one roof to train the next generation of transportation technicians.

College of Alameda

Read more →
MilestoneSeptember 2, 2025

Merritt College opens new Horticulture Complex

Merritt celebrated the grand opening of its new Horticulture Complex — designed by Noll & Tam Architects and built with a $23.6M construction budget — pairing modern classrooms and labs with outdoor learning spaces to support more than 25 courses and roughly 1,600 students each year.

Merritt College

Read more →
MilestoneApril 18, 2025

Milvia Street Expansion tops off in downtown Berkeley

Crews placed the final beam on the six-story, 60,000 sf building at 2118 Milvia — marking structural completion one year after groundbreaking. The building is scheduled to open to the community in Fall 2026.

Berkeley City College

Read more →
CommunityMarch 26, 2025

District sells $362.7 million in Measure G bonds

The District sold $362.7M in general obligation bonds, providing the funding to advance the current wave of Measure G construction across all four colleges.

District-wide

Read more →

Upcoming

Sep102026

Milvia Street Expansion — Ribbon Cutting

September 10, 2026 · 12:30–2:30 pm · 2118 Milvia Street, Berkeley

Recent

Oct282025

Laney College — Groundbreaking & Fab Lab Ribbon Cutting

October 28, 2025 · 4:00–6:00 pm · Laney College · Groundbreaking for Theater Rehabilitation, Learning Resource Center and Locker Room Rehabilitation, with ribbon cutting for the Fab Lab Relocation and Cosmetology project (Small Capital Improvements)

Jun172025

PCCD Vendor Open House 2025

June 17, 2025 · District Office · Open to vendors, contractors, and small local businesses

View flyer →
Apr32025

Theater Rehabilitation — SLBE outreach

April 3, 9 & 11, 2025 · Three SLBE outreach sessions for small local businesses interested in the Laney Theater Rehabilitation project

View flyer →
Nov142024

Learning Resource Center — SLBE outreach

November 14, 20 & December 5, 2024 · SLBE outreach sessions connecting small local businesses with General Contractors bidding the Laney Learning Resource Center project

View flyer →
Apr232024

Milvia Street Expansion — Groundbreaking

April 23, 2024 · 2050 Center Street, Berkeley · Ceremony for the 2118 Milvia Street project

View flyer →
Sep62023

Horticulture Complex — Groundbreaking

September 6, 2023 · Merritt College, 12500 Campus Drive, Oakland

View flyer →
May32023

Transportation Technology Center — Groundbreaking

May 3, 2023 · College of Alameda · Transportation Technology Center ceremony

View flyer →

For ongoing outreach events, workshops, and matchmaking sessions, visit the Work with Us page or email buildperalta@peralta.edu.

About

Measure G bond program

A voter-approved $800 million bond to modernize and expand facilities at all four Peralta campuses.

Measure G · November 2018

$800M

About the bond measure

Approved by 76% of voters

During the November 2018 election, voters of Northern Alameda County overwhelmingly approved Measure G — the District's $800 million bond proposal to facilitate improvements to facilities and new construction across all four Peralta Colleges. It is the largest bond in PCCD history.

$800MBond investment
76%Voter approval
10%Minimum per college, guaranteed

How the program is run

Measure G projects are monitored by an internal group of stakeholders who move the projects forward based on the totality of the program, as well as the instructional and service needs of each campus. The District has assembled an implementation and execution team to deliver against the approved bond program.

To run the program, the District has hired experts in construction, project management, and labor compliance — working to maximize efficiency and adherence to District policies and planning, including the District's Project Labor Agreement. The District will hire a Capital Program Director with procurement staff to perform the project accounting and financial operations for the Bond Program and ensure that progress payments and vendor payments are made in a timely manner and based upon supporting documentation and in compliance with standard accounting procedures and best practices for school construction.

How projects are selected

The Measure G program is built on the District-wide Facilities Master Plan, with priorities established by each campus working collaboratively to identify the projects that will be funded by the bond. The District guarantees that each college will receive funding in an amount no less than 10% of bond proceeds.

About

The Peralta Colleges

Founded in 1964, the Peralta Community College District serves Albany, Alameda, Berkeley, Emeryville, Oakland, and Piedmont with four colleges committed to accessible, high-quality education.

1964District founded
30,000+Students enrolled
6Cities served

About the District

The Peralta Community College District (PCCD) is a collaborative community of colleges comprised of Berkeley City College, College of Alameda, and Laney and Merritt colleges in Oakland. The Peralta Colleges offer a dynamic multicultural learning environment with accessible, high-quality educational programs and services — including two-year degrees, certificates, and university transfer programs — to more than 30,000 students. PCCD is also home to award-winning Peralta TV (Comcast ch. 27/28, AT&T ch. 99) and public radio KGPC-LP 96.9 FM.


Dr. Tammeil Gilkerson, Chancellor

Dr. Tammeil Gilkerson

Chancellor · Peralta Community College District

"I call Oakland my home, and my roots run deep in the East Bay. Within Peralta, I see a wealth of brilliance and remarkable progress happening at the colleges and across the district. I'm eager to play a role in enhancing a multitude of outstanding programs and services, all guided by a commitment to equity and social justice."

Dr. Gilkerson previously served as President of Evergreen Valley College in San José and as President of Laney College from 2017 to 2020. With nearly two decades of community college leadership experience, she has been a consistent advocate for student success, equity, and social justice in the East Bay.


Berkeley City College

2050 Center St, Berkeley, CA

Urban campus in downtown Berkeley offering transfer programs and career education with strong connections to UC Berkeley and Bay Area employers.

College of Alameda

555 Ralph Appezzato Memorial Pkwy, Alameda, CA

Located on a former Naval Air Station, known for aviation maintenance technology, auto/diesel technology, and allied health programs.

Laney College

900 Fallon St, Oakland, CA

The largest college in the District, offering over 100 programs and serving as a hub for workforce development and the construction trades MC3 pre-apprenticeship training program.

Merritt College

12500 Campus Dr, Oakland, CA

Nestled in the Oakland hills, known for environmental horticulture, child development, kinesiology, and a renowned farm lab.

Projects

Construction across the District

Active and planned Measure G projects at all four Peralta campuses.

Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.

Berkeley City College3 projects

Project list

Milvia Street Expansion

A new six-story building at Milvia and Center Streets adding classrooms, art studios, learning resource facilities, and expanded student and faculty support areas.

$93.6M budget · 95% expended · CM: Kitchell CEM

In progress

Center Street Modernization

Renovation of the existing 2050 Center Street building, beginning after relocations to the new Milvia building are complete. Adds STEM labs and classrooms, expands the library, and improves faculty office spaces.

$5.0M budget · 1% expended

Upcoming

Site Rehabilitation, Security and Infrastructure

Site improvements, infrastructure and security upgrades across the Berkeley City College campus, including pathways, utility systems and access control.

$1.2M budget · 59% expended · CM: Kitchell CEM

Completed

Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.

College of Alameda4 projects

Transportation Technology Center

A new consolidated facility for the Auto and Diesel Technology programs, incorporating training for alternative fuels including fuel cells and hybrids. Funded with a blend of State and local Measure G bond funds.

$16.2M budget · 94% expended · CM: Roebbelen

Completed

Aviation Complex Modernization

Modernizes the aviation maintenance technology complex on one acre of District-owned property adjacent to Oakland Airport — one of only two such programs in the Bay Area.

$44.8M budget · 6% expended · CM: Cumming Management Group

In design

Pickleball & Parking Lot Renovations

Conversion of the existing tennis courts to dual-use tennis and pickleball courts, together with parking lot improvements adding shade canopies, solar panels and ADA accessible parking stalls. Added to the bond list by the April 14, 2026 revision with a $3.0M budget; design is underway.

$3.0M budget · 3% expended · Design: DSK Architects

In design

Security and Infrastructure

Security and infrastructure upgrades across the College of Alameda campus, including site utilities, elevators and access systems.

$2.1M budget · 100% expended · Design: LPAS

Completed

Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.

Laney College4 projects

Learning Resource Center

A new Learning Resource Center serving as the gateway to the campus from Parking Lot A along 7th Street. Construction began in April 2025. Funded with a blend of State and local Measure G bond funds.

$77.7M budget · 7% expended · CM: Jacobs Project Management

In progress

Theater Rehabilitation

Modernization of the Theater building to better serve current student needs — increased seating capacity, new theater and rehearsal support spaces, more effective teaching environments, and comprehensive accessibility improvements. Funded with a blend of State and local Measure G funds.

$32.8M budget · 23% expended · CM: Jacobs Project Management

In progress

Central Utility Plant

Replacement of existing chillers, boilers, and cooling towers; repair or replacement of associated pumps, piping, and valves; and a new Building Automation System. New chillers and boilers locate in the existing Central Plant in Building E; new cooling towers in a new enclosure south of Building F, with new piping connecting back to Building E.

$17.9M budget · 96% expended · CM: Swinerton Management

In progress

Student Center Improvements

Modernization of the existing student center facility, cafeteria and associated spaces. The April 14, 2026 revision added fire alarm modernization to the scope, moving that work across from the Campus-Wide Fire Alarm Modernization project and bringing the budget to $10.5M. Construction is under way.

$10.5M budget · 14% expended · CM: Jacobs Project Management

In progress

Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.

Merritt College3 projects

Child Development Center

A new permanent facility to support demonstration, lab program, instructional, and administrative space for an educational program designed for TK/Pre-K children. Located on the Merritt campus for safe and efficient direct-auto access for drop-off and pick-up. Funded with a blend of State and local Measure G bond funds.

$39.3M budget · 54% expended · CM: Kitchell CEM

In progress

Horticulture Buildings

Replaces the existing horticulture facility. Existing large lecture rooms are no longer suited to the instructional program; new laboratory and lecture spaces will be configured to support contemporary horticulture techniques and practices. Funded with a blend of State and local Measure G funds.

$29.9M budget · 93% expended · CM: Kitchell CEM

Completed

Replace Bldgs. E&F — Kinesiology and Physical Training

Replacement of the existing locker room and gym buildings to provide open spaces adequately equipped and sized for wellness and fitness programming. Funded with local Measure G bond funds.

$43.5M budget · 0% expended · Design: JKAE Architects

In design

Projects with Measure G financial activity January 1 – March 31, 2026. The complete program is on the Board Approved Bond List, and budgets vs. expenditures for every active project are in the Financial Dashboard’s Project Budget Tracker.

District-wide5 projects

4102 – Furniture, Fixtures and Equipment

$15.0M budget · 1% expended

4105 – Information Technology Replacement

$31.0M budget · 54% expended

4110 – Small Capital Improvements

$25.0M budget · 29% expended

4111 – Demo (Demolition of obsolete facilities)

$10.0M budget · 0% expended

4998 – Program Management

$25.4M budget · 45% expended

Berkeley City College2 projects

4801 – Site Rehabilitation, Security and Infrastructure

$1.2M budget · 59% expended

4802 – Milvia Street Expansion

$93.6M budget · 95% expended

View project →
College of Alameda7 projects

4201 – Security and Infrastructure

$2.1M budget · 100% expended

4202 – Transportation Technology Center

$16.2M budget · 94% expended

View project →

4204 – ADA and Site Improvements

$5.8M budget · 5% expended

4206 – New Classroom Building

$35.0M budget · 0% expended

4208 – Aviation Complex Modernization

$44.8M budget · 6% expended

View project →

4209 – Elevator Upgrades

$1.5M budget · 48% expended

4212 – Pickleball and Parking Lot Renovations

$3.0M budget · 3% expended

View project →
Laney College14 projects

4501 – Laney Campus Rehabilitation (CM and planning services for theatre and locker room project)

$0.5M budget · 100% expended

4502 – Locker Room Rehabilitation - Portable Modulars Swing Space

$6.3M budget · 78% expended

4503 – Furniture, Fixtures and Equipment

$1.4M budget · 88% expended

4506 – Locker Room Rehabilitation

$16.1M budget · 17% expended

View project →

4508 – Elevator Upgrades

$3.8M budget · 32% expended

4509 – Roofing Improvements

$4.1M budget · 56% expended

4510 – Learning Resource Center

$77.7M budget · 7% expended

View project →

4511 – Central Utility Project

$17.9M budget · 96% expended

View project →

4514 – Theater Rehabilitation

$32.8M budget · 23% expended

View project →

4515 – Water Main Relocation

$3.0M budget · 90% expended

4516 – Student Center Improvements

$10.5M budget · 14% expended

View project →

4517 – Campus-Wide Fire Alarm Modernization

$14.1M budget · 6% expended

4518 – Small Capital Improvements

$7.2M budget · 98% expended

4519 – Fab Lab Relocation

$2.1M budget · 100% expended

Merritt College9 projects

4601 – Site Improvements, Security and Infrastructure

$5.3M budget · 58% expended

4602 – Horticulture Buildings

$29.9M budget · 93% expended

View project →

4604 – ADA and Site Improvements

$7.6M budget · 5% expended

4606 – Science and Allied Health Building Classrooms, Labs and Center for Social Justice and Civic Engagement

$8.6M budget · 9% expended

4608 – Child Development Center

$39.3M budget · 54% expended

View project →

4609 – Replace Bldgs. E and F - Kinesiology and Physical Training

$43.5M budget · 0% expended

4610 – Elevator Upgrades

$1.8M budget · 66% expended

4611 – Substations B and D

$16.4M budget · 6% expended

4612 – Secondary Power Substation C Replacement

$4.4M budget · 84% expended

Reports

Reports & Audits

All Measure G expenditures are reviewed by an independent Citizens' Bond Oversight Committee and reported publicly.

Board Approved Bond List

Related resources

Complete list of Measure G projects

The official, Board Approved list of all projects approved under the Measure G bond.

View list →

Financial Audit Statements & Performance Audit Reports

Independent annual financial and Proposition 39 performance audits of the Measure G bond program, published by the District

View audits →

Facilities Update — August 25, 2026 Board Meeting

Capital projects portfolio, Facilities Master Plan progress, Bond List Revisions #3 and #4, and the August 2026 bond sale

View PDF

Bond List Revision — April 14, 2026

Revisions to the Measure G project list · effective April 14, 2026

View PDF

Citizens' Bond Oversight Committee (CBOC)

Independent oversight, agendas, minutes, and annual reports — peralta.edu/cboc

Visit CBOC site →

Small Local Business Enterprise Program (SLBE)

Board Policy 6356 and Administrative Procedure 6356, plus certification directories and program guidance

Visit SLBE site →

Project Labor Agreement

PLA covering eligible bond-funded capital improvement projects, plus the 2024 5-year extension and 2025 side letter

Visit PLA site →

Facilities Master Plan (FTMP) — BOT March 13 update

The District-wide long-range capital planning document. Projects are selected and prioritized through this plan.

Visit District site →

Measure G Bond Resolution

Authorizing language for the $800M bond approved by 76% of voters in November 2018

View PDF

Work with us

Work with Build Peralta

The District is committed to ensuring Measure G funds are reinvested into the local community through local hiring, small business participation, and fair contracting.

For more information on the Capital Program's Local Business Outreach Program, email buildperalta@peralta.edu.

Local Business Outreach

As part of the District's commitment to ensure voter-approved bond money is reinvested back into the local community, the District and Bond Program Management provide extensive local business outreach for the Capital Program's projects. There are ongoing local business outreach workshops, technical assistance trainings, small business webinars, and community forums.

Step 1 of 2

Peralta Supplier Portal

Register with the District directly to be added as an approved supplier. Required for invoicing, payment, and any contract work with Peralta.

Register on the Supplier Portal →

Step 2 of 2

Bid opportunities

Browse current RFPs, RFQs, and bid packages on PlanetBids, the District's e-procurement platform. Registered vendors receive automated notifications of new opportunities.

Browse bid opportunities →

Small Local Business Enterprise Program (SLBE)

25% SLBE utilization provision on bond-funded contracts. Covers eligibility, certification agencies, and how contract-by-contract bidding preferences work. See Board Policy BP 6356 and Administrative Procedure AP 6356.

Learn more →

Business Outreach

Workshops, technical assistance trainings, webinars, and community forums. Current and recent events including the 2025 PCCD Vendor Open House.

See events →

Project Labor Agreement

The District's PLA supports labor stability and workforce development on eligible Measure G work — coordinating with building trades pathways and Laney's MC3 training program (est. 2025). 5-year extension executed 2024.

View the PLA →

Small Business Advisory Council

An advisory body that helps guide the District's small-business engagement and outreach strategy, providing community and industry input into how local firms participate in the Measure G program.

Learn more →

Purchasing Department ↗

For RFPs, RFQs, bids, vendor registration, and contract questions, visit the PCCD Purchasing Department site.

peralta.edu/purchasing →

Vendor Registration ↗

Register on PlanetBids — the District's e-procurement platform — to receive automated notifications of upcoming bids and RFPs.

PlanetBids vendor portal →

RFP / RFQ / Bids ↗

Browse all active solicitations including construction bids, professional services RFQs, and other opportunities on PlanetBids.

View active bids →

Work with us

Small Local Business Enterprise Program (SLBE)

The District's commitment to equal opportunity and equitable treatment in public contracting — anchored by a 25% SLBE utilization provision.

← Work with us

About the program

The Peralta Community College District is committed to ensuring equal opportunity and equitable treatment in the awarding and administration of its public contracts. To support that commitment, the District has established an annual overall program goal of 25% participation by Small Local Business Enterprises (SLBE) on bond-funded contracts.

How bidding preferences work

To facilitate opportunities for small local businesses, the District determines bidding preferences on a contract-by-contract basis. The preference is used only for computation purposes — to determine the winning bidder — and the contract is awarded at the actual bid amount.

Whether a preference applies, and at what level, depends on the specific solicitation. Please review the guidelines below to see if your firm qualifies for the preference on a given contract.

Eligibility

Eligibility is determined based on three factors:

Criterion 1

Scope of work or trade

The work being performed must align with eligible scopes recognized under the SLBE program.

Criterion 2

Firm revenue size

The firm must meet the program's revenue thresholds, which vary by industry and scope.

Criterion 3

Business location

The firm must be located within the District's designated market area, as defined in Administrative Procedure 6356.


Small and local businesses can certify through the agencies below. A current certification helps establish SLBE eligibility and lists your firm in public supplier databases. Select an agency to begin its certification or supplier search.

Alameda County

Small Local & Emerging Business (SLEB) supplier database

Visit site ↗

CA Department of General Services

Cal eProcure — Small Business (SB) & Disabled Veteran Business Enterprise (DVBE) certification search

Visit site ↗

California Unified Certification Program

Disadvantaged Business Enterprise (DBE) certification — represents 10 California certifying agencies

Visit site ↗

City of Oakland

Local & Small Local Business Enterprise (LBE/SLBE) certification

Visit site ↗

Port of Oakland

Small Local Business Enterprise certification application

Visit site ↗

US Small Business Administration

Federal certification search — 8(a), HUBZone, WOSB, SDVOSB

Visit site ↗

BP 6356 — Small Local Business Enterprise Program

Board Policy · Board-approved

View PDF

AP 6356 — Small Local Business Enterprise Program

Administrative Procedure · Board-approved

View PDF

Questions about the program?

For more information on the Capital Program's Local Business Outreach Program, email buildperalta@peralta.edu.

See upcoming outreach events →

Program update

Board Policy 6356 — SLBE Program Update

Revised Board Policy and Administrative Procedure approved by the Board of Trustees on February 10, 2026.

← Home

Peralta Community College District has updated Board Policy and Administrative Procedure 6356, governing the District's Small Local Business Enterprise (SLBE) Program. Following the District's shared-governance review process, the revised Board Policy was approved by the Board of Trustees on February 10, 2026.

The updated program continues Peralta's longstanding commitment to creating meaningful opportunities for small and local businesses and to supporting economic activity within our surrounding communities. The program maintains a 25% SLBE utilization provision for covered contracts and provides 3% to 5% bidding preferences for bidders that commit to SLBE participation above the established utilization requirement. Under the revised policy, these provisions apply to covered construction, professional services, and supply contracts valued at $1 million or more.

The updated policy continues to encourage meaningful participation by certified small local businesses in District contracting while enhancing program accountability, outreach, stakeholder engagement, and technical assistance, while continuing to prioritize firms with strong ties to the communities the District serves. Eligibility criteria, including the designated market area, are set out in Board Policy 6356 and Administrative Procedure 6356.

Read the policy: Board Policy 6356 (PDF)  ·  Administrative Procedure 6356 (PDF)

Peralta remains committed to increasing the participation and capacity of small local businesses in District contracting and to ensuring that the District's capital investments continue to generate opportunities within the communities we serve.

Related resources

Learn more about the SLBE Program

For information about SLBE eligibility, program requirements, upcoming contracting opportunities, and assistance available to local businesses, please visit the Build Peralta Small Local Business Enterprise Program webpage.

Visit the Small Local Business Enterprise Program →

Work with us

Build Peralta Academy

A nine-session workshop and technical-assistance bootcamp for small businesses on the Measure G program. Inform · Educate · Connect.

ArchivedRetained for reference and not linked from the public site.

← Back to Archive

9Workshop sessions per series
90%Attendance for Certificate of Completion
2 hrsPer session · panel or workshop format

What it is

Build Peralta Academy is a nine-session workshop and technical-assistance bootcamp that includes instruction by industry subject-matter experts. The workshops are created to provide support and help ensure success for small businesses working — or interested in working — on the Measure G bond program, as well as for Peralta students interested in construction and design projects.

Sessions are conducted in either lecture or panel format, in person or virtually. Attendees who participate in 90% of the courses in one series will receive a Certificate of Completion.

Three goals: Inform · Educate · Connect

Inform

Sessions are led by subject-matter experts, providing critical information to participants.

Educate

Knowledge-transfer sessions are each two hours, in panel or workshop format.

Connect

Since sessions are led by key officials from the District and PMO, participants meet project and district leaders.


New Academy content in development. An updated Build Peralta Academy series is being prepared for the Measure G program. Session topics, schedule, and registration will be posted here. The session list below is archived from prior series. Presentation files are being restored — to request a copy of any session's materials in the meantime, email buildperalta@peralta.edu.

Topics covered by past Build Peralta Academy sessions are listed below. This list will be replaced as new content is published.

How to do business and pre-qualification with Peralta Colleges

Build Peralta Academy session

The Art of Estimating and Cost Savings 101

Build Peralta Academy session

Managing Cashflow in the Construction Industry

Build Peralta Academy session

How to Create Award-Winning Proposals

Build Peralta Academy session

How to Bid Informally and Formally (including CUPCCAA)

Build Peralta Academy session

How to obtain Bonding and Insurance

Build Peralta Academy session

PCCD Small Business Program & Local Small Business Certification

Build Peralta Academy session

Scheduling Basics

Build Peralta Academy session

Change Management: How to Manage Scope, Schedule, Budget

Build Peralta Academy session

Small Business Plan Concept Presentation

Build Peralta Academy session

Small Business Resource Panel

Build Peralta Academy session

SBA Update — Surety Bond Guarantee, PPP and Loans

Build Peralta Academy session

Developing A Safety Program During COVID-19 Era

Build Peralta Academy session

Follow Build Peralta Academy at #buildperaltaacademy.

Work with us

Business Outreach

Workshops, technical assistance trainings, webinars, and community forums for the Measure G Capital Program.

← Work with us

Local Business Outreach

As part of the District's commitment to ensure that voter-approved bond money is reinvested back into the local community, the District and Bond Program Management provide extensive local business outreach for the Capital Program's projects. There are ongoing local business outreach workshops, technical assistance trainings, small business webinars, and community forums. For more information, email buildperalta@peralta.edu.


Jun172025

Outreach events

PCCD Vendor Open House 2025

June 17, 2025 · District Office · Open to vendors, contractors, and small local businesses

View flyer →
Apr32025

Theater Rehabilitation — SLBE outreach

April 3, 9 & 11, 2025 · Three SLBE outreach sessions for small local businesses interested in the Laney Theater Rehabilitation project

View details →
Nov142024

Learning Resource Center — SLBE outreach

November 14, 20 & December 5, 2024 · SLBE outreach sessions connecting small local businesses with General Contractors bidding the Laney Learning Resource Center project

View flyer →
2022

PCCD 2022 Update — 6 Months Look Ahead Virtual Outreach

Virtual presentation covering upcoming Measure G opportunities

Download PDF →
2022

PCCD Matchmaking — Berkeley CC West (multiple sessions)

In-person matchmaking events connecting prime contractors with local subs

2021

October 2021 Virtual Business Outreach

Q&A session with PMO leadership · Presentation PDF available

Download Q&A PDF →
2020

Build Peralta Virtual Business Outreach

May 28, 2020 · Available in English, Spanish, and Chinese

Download PDFs →

Want to host or attend an outreach event?

Contact the Capital Program's Local Business Outreach team at buildperalta@peralta.edu for upcoming events, matchmaking opportunities, and project-specific SLBE outreach.

Work with us

Project Labor Agreement

The PLA governs construction on eligible bond-funded capital improvement projects, supporting quality delivery, labor stability, and workforce development.

← Work with us

District commitment

The District is committed to delivering Measure G construction through a Project Labor Agreement that supports fair wages, safe job sites, labor stability, and — critically — pathways into the building trades for local residents and Peralta students. The PLA is a core part of how the program returns value to the community it serves.

About the PLA

The Peralta Community College District utilizes a Project Labor Agreement (PLA) on eligible bond-funded capital improvement projects to support high-quality construction delivery, labor stability, and workforce development across PLA-covered work.

Workforce development

The PLA coordinates workforce participation through building and construction trades pathways, established systems, and state-recognized training programs — including the Laney College Multi-Craft Core Curriculum (MC3) program established in 2025. Local workforce development organizations play an important role in supporting apprenticeship readiness and construction career pathways.


PLA Agreement

Full Project Labor Agreement document

View PDF

2024 5-Year Extension

Chancellor's letter to BTC · June 2024

View PDF

2025 PLA Side Letter — Arbitrators

Executed May 2025 · all parties

View PDF

MC3 Training Program — Laney College

The Multi-Craft Core Curriculum (MC3) is a state-recognized pre-apprenticeship training program that prepares workers for careers in the building and construction trades. Established at Laney College in 2025, MC3 graduates have a recognized pathway to registered apprenticeship in the trades that participate in the District's PLA.

Work with us

Small Business Advisory Council

A community and industry advisory body that helps guide how local small businesses participate in the Measure G program.

← Work with us

Purpose

The Small Business Advisory Council provides community and industry input into the District's small-business engagement strategy for the Measure G Capital Program. The Council advises on outreach, technical-assistance priorities, and ways to strengthen participation by local firms — helping ensure the program reflects the businesses and communities it serves.

What the Council does

Advise

Offers guidance on outreach and engagement so local small businesses can find and pursue Measure G opportunities.

Connect

Bridges the District, the PMO, and the local business community to surface barriers and share opportunities.

Inform

Helps shape program materials and technical-assistance offerings for the local small-business community.

Get involved

Meeting schedules, membership, and participation details will be posted here. To express interest or learn more, contact the program at buildperalta@peralta.edu or call (510) 587-7828.


Small Local Business Enterprise Program

25% SLBE utilization provision · BP 6356 / AP 6356

View program →

Business Outreach

Workshops, trainings, and community forums

See events →

Contact

Get in touch

Reach the Build Peralta team with questions about projects, business opportunities, or the Measure G bond program.

Your message goes directly to buildperalta@peralta.edu.

Financials & accountability

Financial Dashboard

A quarterly view of Measure G bond funds — how much has been authorized, spent, and what remains across all four campuses.

Reporting Period: Inception through 3/31/26. View the latest quarterly report (PDF)

Total authorized

$809.93M

Measure G · incl. unallocated bond interest

Funds expended

$257.57M

31.8% of total authorized

Funds encumbered

$153.56M

Contracted, not yet spent

Remaining balance

$398.81M

Available for future projects

Dashboard sections

Measure G by campus Budgets and expenditures · inception through March 31, 2026

$809.93M authorized
Berkeley City College — $102.99M budget · $83.50M expended
College of Alameda — $113.38M budget · $29.08M expended
Laney College — $213.37M budget · $49.15M expended
Merritt College — $160.35M budget · $62.66M expended
District-wide — $215.38M budget · $33.18M expended
Unallocated bond interest — $4.45M

Bond allocation breakdown $809.93M total

31.8% expended
Expended — $257.57M (31.8%)
Encumbered — $153.56M (19.0%)
Uncommitted — $398.81M (49.2%)

Encumbered funds are the undrawn balance of contracts already awarded. Uncommitted funds are not yet under contract.

Project Budget Tracker Measure G funds only

Measure G Budget — Bond List (August 25, 2026)
Measure G Expensed — inception through March 31, 2026


Audit & report archive

Financial Audit Statements & Performance Audit Reports

Independent annual audits published by the District

Visit Page

CBOC Committee Annual Reports

Findings published by the Citizens' Bond Oversight Committee

Visit Page

Facilities & Technology Master Plans

Long-range capital planning documents

Visit Page

Citizens' Bond Oversight Committee

JC

Jeff Cambra, Chair

At-large member

JT

Joby Thomas, Vice Chair

Senior citizens’ organization

MM

Mark McComb

At-large member

TG

Tarrell Gamble

Business organization

BS

Benjamin Scott

Community college supporter

Vacant

Taxpayers’ organization

Vacant

Student member

Meetings, agendas & minutes

The CBOC meets quarterly in public session. Meeting dates, agendas and minutes are published and kept current by the District.

CBOC agendas & minutes

peralta.edu/cboc/agendas-minutes

Visit Page

About

About Build Peralta

What this website is, why it exists, and how to use it.

What is Build Peralta?

Build Peralta is the official public-facing website for the Peralta Community College District's capital construction program — funded by the voter-approved Measure G general obligation bond. The site exists to make visible how bond dollars are being spent, where construction is happening, and which projects are underway, for the community, taxpayers, students, and business partners who help deliver the work.

This site is maintained by the District's Department of General Services and the Project Management Office (PMO), with independent oversight from the Citizens' Bond Oversight Committee (CBOC).

Why it matters

In November 2018, voters approved Measure G — an $800 million bond — by an overwhelming 76% majority. It is the largest taxpayer-funded investment in PCCD's history, supporting facility improvements and new construction at Berkeley City College, College of Alameda, Laney College, and Merritt College. The District guarantees that each college will receive funding in an amount no less than 10% of bond proceeds.

The bond came with a commitment to transparency: every dollar spent is reviewed by the CBOC and published here for the public to see. Build Peralta is how that commitment shows up day to day — schedules, budgets, project status, board-approved scope, and contracting opportunities, all in one place.

How the program is governed

Projects are monitored by an internal group of District stakeholders working from the District-wide Facilities Master Plan, with priorities established collaboratively by each campus. To deliver the work, the District has hired experts in construction, project management, and labor compliance — a Director of Capital Projects leads the team and works in compliance with the District's Project Labor Agreement.

How to use this site

Most people come here for one of four things: to see what's being built and when (Projects, Schedules), to understand how the bond dollars are being spent (Financial Dashboard, Reports), to work with the District (Work with Us), or to follow news and milestones (News & Updates). The FAQ answers common questions, and the Contact page lists who to call for what.


$800MMeasure G bond
76%Voter approval · 2018
10%Minimum guaranteed per college

About

Organization Chart

How the Measure G bond program is organized — from the Board of Trustees through the PMO to the construction management firms delivering each project.

Peralta Community College District

Board of Trustees · Voter-elected, 7 members

Office of the Chancellor and District Leadership

Dr. Tammeil Gilkerson · Chancellor
Greg Nelson · Deputy Chancellor / Chief Operating Officer

Department of General Services (DGS)

Amy Marshall · Director of Capital Projects

Project Management Office (PMO)

AECOM

Program oversight, design and construction

Lowe Consulting Group

SLBE, community outreach, PLA & compliance

VM3 Consulting

Program controls & reporting

Current construction management

Kitchell CEM

Jacobs Project Management

Roebbelen

Cumming Management Group

Swinerton Management


How oversight works

The Citizens' Bond Oversight Committee (CBOC) is independent of the District organization shown above. It is appointed by the Board of Trustees but operates as a separate oversight body — reviewing expenditures, auditing reports, and publishing findings to the public. Both the CBOC and the Board of Trustees are explained in their own sections of this site.

Citizens' Bond Oversight Committee

Independent review of all Measure G expenditures →

Board of Trustees

Elected governing body of the District →

About — Oversight

Citizens' Bond Oversight Committee

An independent body of community volunteers reviewing how Measure G funds are spent.

What the CBOC does

State law (Proposition 39) requires every California school district that passes a 55% threshold general obligation bond to form a Citizens' Bond Oversight Committee. The CBOC's role is to ensure that all bond proceeds are spent only for projects authorized by voters — not on salaries, pensions, or operating expenses.

Operating separately from the District organization, the CBOC meets quarterly in public sessions, reviews independent financial and performance audits, and publishes its agendas, minutes, and annual reports at peralta.edu/cboc. Meetings are open to the public; members of the community are encouraged to attend.

Prop 39State-required independent oversight
QuarterlyPublic meetings
AnnualIndependent financial & performance audits

How to participate

CBOC members are appointed by the Board of Trustees from designated categories including taxpayers' associations, business organizations, senior citizens' groups, students, and members of the community at large. If you're interested in serving, see current members and openings on the District site.


View CBOC annual reports →

About — Governance

Board of Trustees

The elected governing body of the Peralta Community College District.

About the Board

The PCCD Board of Trustees is composed of seven elected members representing the six cities served by the District: Alameda, Albany, Berkeley, Emeryville, Oakland, and Piedmont. Two student trustees also serve in advisory roles.

7Elected trustees
6Cities represented
2Student trustees (advisory)

The Board sets District policy, approves the budget, awards contracts above statutory thresholds, and ratifies major actions related to the Measure G bond program — including approval of project lists, bid awards, and master plans.

Trustees by area

Area 1

Bill Withrow

Area 2

Paulina Gonzalez-Brito

Area 3

Louis Quindlen

Area 4

Nicky González Yuen

Area 5

Cindi Napoli-Abella Reiss

Area 6

Dyana Delfín Polk

Area 7

Sheweet Yohannes

Student Trustee

Harsheet Subedi

Student Trustee

Jazlyn Tandel

The current roster and a trustee-area boundary map are on the District Board of Trustees site.

Meeting information

Board meetings are held publicly and are streamed live. Full meeting agendas, supporting documents, and minutes are posted on the District's BoardDocs site, which is the official record for all Board actions.


Visit BoardDocs →

Program documents

Board Approved Bond List

The complete list of projects approved under the Measure G bond.

This list reflects the Measure G Bond List Revision approved by the Board of Trustees on August 25, 2026. State Funding is the budgeted state award. Other additional funding outside of Measure G and State may contribute to the implementation of these projects.
ProjectMeasure G FundingState Funding
College of Alameda
4201– Security and Infrastructure$2,215,799
4202– Transportation Technology Center$15,704,449$16,569,000
4203– Furniture, Fixtures and Equipment$1,001,528
4204– ADA and Site Improvements$5,804,406
4205– Information Technology Replacement$100,932
4206– New Classroom Building$35,001,057
4207– Campus-Wide Rehabilitation (Keyless Entry Study)$42,255
4208– Aviation Complex Modernization$44,833,343$14,648,000
4209– Elevator Upgrades$1,506,962
4210– Roofing Improvements$2,860,772
4211– Science Annex HVAC Rehabilitation$27,471
4212– Pickleball and Parking Lot Renovations$3,000,000
4299– College of Alameda Campus Contingency$1,000,000
College of Alameda — subtotal$113,098,974$31,217,000
Berkeley City College
4801– Site Rehabilitation, Security and Infrastructure$1,157,210
4802– Milvia Street Expansion$93,284,099
4803– Center Street Modernization$5,004,769
4804– Campus-Wide Rehabilitation (Keyless Entry Study)$105,061
4805– Information Technology Replacement$2,109,424
4899– Berkeley City College Campus Contingency$1,000,000
Berkeley City College — subtotal$102,660,562
Laney College
4501– Laney Campus Rehabilitation (CM and planning services for theatre and locker room project)$464,900
4502– Locker Room Rehabilitation - Portable Modulars Swing Space$6,363,446
4503– Furniture, Fixtures and Equipment$1,466,012
4504– ADA and Site Improvements$5,000,000
4505– Information Technology Replacement$1,528,285
4506– Locker Room Rehabilitation$16,123,668
4507– Campus-Wide Rehabilitation (Keyless Entry Study)$59,668
4508– Elevator Upgrades$3,859,044
4509– Roofing Improvements$3,416,351
4510– Learning Resource Center$78,032,167$24,417,000
4511– Central Utility Project$18,193,830
4512– BEST Center Modernization$200,000
4513– Building A and B Renovation$8,000,000
4514– Theater Rehabilitation$33,219,255$7,999,000
4515– Water Main Relocation$3,007,040
4516– Student Center Improvements$11,758,750
4517– Campus-Wide Fire Alarm Modernization$14,159,405
4518– Small Capital Improvements$7,255,724
4519– Fab Lab Relocation$2,165,820
4599– Laney College Campus Contingency$1,000,000
Laney College — subtotal$215,273,363$32,416,000
Merritt College
4601– Site Improvements, Security and Infrastructure$5,309,479
4602– Horticulture Buildings$28,998,676$9,789,000
4603– Furniture, Fixtures and Equipment$1,012,551
4604– ADA and Site Improvements$7,590,272
4605– Information Technology Replacement$1,632,312
4606– Science and Allied Health Building Classrooms, Labs and Center for Social Justice and Civic Engagement$8,634,569
4607– Campus-Wide Rehabilitation (Keyless Entry Study)$50,706
4608– Child Development Center$39,594,349$6,128,000
4609– Replace Bldgs. E and F - Kinesiology and Physical Training$43,459,902$22,445,000
4610– Elevator Upgrades$1,781,925
4611– Substations B and D$16,384,968
4612– Secondary Power Substation C Replacement$4,592,025
4699– Merritt College Campus Contingency$1,000,000
Merritt College — subtotal$160,041,734$38,362,000
Districtwide
4101– District Service Center Rehabilitation$3,984,678
4102– Furniture, Fixtures and Equipment$15,016,680
4103– Fixtures, Furniture, and Equipment and Information Technology$4,054,908
4104– ADA and Site Improvements$21,000,000
4105– Information Technology Replacement$31,325,315
4106– Signage and Wayfinding$2,501,385
4107– Library Equipment and Books$18,264
4108– Emergency Phone Project – Phase 2$527,917
4109– Energy and Sustainability$50,002,651
4110– Small Capital Improvements$24,942,689
4111– Demo (Demolition of obsolete facilities)$10,000,000
4112– Vehicles$1,000,000
4113– Districtwide Utility Master Plan$3,000,000
4114– Districtwide Access Controls$3,000,000
4998– Program Management$19,521,016
4999– Program Contingency$28,957,476
Districtwide — subtotal$218,852,979
Grand Total · Measure G + State Funding$809,927,612$101,995,000

Each college is guaranteed a minimum 10% allocation of Measure G bond proceeds. Measure G figures are board-approved budgets from the August 25, 2026 bond list revision. For related program documents, see Reports & Audits.

Program documents

Program Schedules

High-level schedule view across all Measure G projects. Click any project to see its detail page and milestone schedule.

Project
202120222023202420252026202720282029203020312032
BCC4802 – Milvia Street Expansion
BCC4803 – Center Street Modernization
COA4202 – Transportation Technology Center
COA4204 – ADA and Site Improvements
COA4206 – New Classroom Building
COA4208 – Aviation Complex Modernization
LAN4504 – ADA and Site Improvements
LAN4506 – Locker Room Rehabilitation
LAN4510 – Learning Resource Center
LAN4511 – Central Utility Plant
LAN4514 – Theater Rehabilitation
LAN4516 – Student Center Improvements
LAN4517 – Campus-Wide Fire Alarm Modernization
MER4602 – Horticulture Buildings
MER4604 – ADA and Site Improvements
MER4606 – Science & Allied Health Building
MER4608 – Child Development Center
MER4609 – Replace Bldgs. E&F — Kinesiology
MER4611 – Substations B and D
MER4612 – Secondary Power Substation C Replacement
DW4106 – Signage and Wayfinding
Design / planning Construction Closeout & complete

Project phasing from the District’s Master Program Schedule, May 2026 update. Schedules are subject to change.

Project
202120222023202420252026202720282029203020312032
BCC4802 – Milvia Street Expansion
BCC4803 – Center Street Modernization
Design / planning Construction Closeout & complete
Project
202120222023202420252026202720282029203020312032
COA4202 – Transportation Technology Center
COA4204 – ADA and Site Improvements
COA4206 – New Classroom Building
COA4208 – Aviation Complex Modernization
Design / planning Construction Closeout & complete
Project
202120222023202420252026202720282029203020312032
LAN4504 – ADA and Site Improvements
LAN4506 – Locker Room Rehabilitation
LAN4510 – Learning Resource Center
LAN4511 – Central Utility Plant
LAN4514 – Theater Rehabilitation
LAN4516 – Student Center Improvements
LAN4517 – Campus-Wide Fire Alarm Modernization
Design / planning Construction Closeout & complete
Project
202120222023202420252026202720282029203020312032
MER4602 – Horticulture Buildings
MER4604 – ADA and Site Improvements
MER4606 – Science & Allied Health Building
MER4608 – Child Development Center
MER4609 – Replace Bldgs. E&F — Kinesiology
MER4611 – Substations B and D
MER4612 – Secondary Power Substation C Replacement
Design / planning Construction Closeout & complete

FAQ

Frequently asked questions

Answers to the questions we hear most often about the bond program, projects, and how to do business with the District.

About the bond

What is Measure G?
Measure G is the $800 million general obligation bond approved by voters in Northern Alameda County in November 2018 to modernize and expand facilities at all four Peralta colleges.
How is the bond paid back?
As a general obligation bond, Measure G is repaid through property taxes within the Peralta Community College District's boundaries. The repayment schedule is set at issuance and follows standard public-finance practice.
Can bond money be used for salaries or pensions?
No. State law and the bond's authorizing language prohibit Measure G funds from being used for administrator salaries, faculty pay, pensions, or general operating expenses. Funds may only be used for construction, renovation, and modernization of District facilities.

Where the money goes

How much of the bond has been spent so far?
As of the last reconciled quarterly report — inception through March 31, 2026 — $257.57M of the $809.93M in total bond funding has been expended, with another $153.56M encumbered (under active contract). Visit the Financial Dashboard for the full breakdown, or read the latest quarterly report.
How can I see what's been spent at my campus?
The Financial Dashboard shows expenditures broken out by campus and by project. The Board Approved Bond List shows the official budget for every project under the program.
Who reviews the spending?
An independent Citizens' Bond Oversight Committee (CBOC) reviews all Measure G expenditures annually. The CBOC is composed of community members and meets quarterly in public sessions.

Projects

How are projects selected and prioritized?
Projects are identified through the District's long-range Facilities Master Plan and approved by the Board of Trustees. The Board Approved Bond List is the official record.
When will my campus's projects be done?
Each project has its own schedule, which is shown on the project's detail page and on the program-wide Schedules page. Construction timelines vary considerably depending on scope, design phase, and external factors.
Will construction disrupt classes?
The District works hard to minimize disruption. Major phasing decisions account for class scheduling, swing space, and noise mitigation. Campus communications are sent before any significant on-site work begins.

Doing business with Peralta

How do I get notified of upcoming bids?
Register once on the Peralta Supplier Portal — the District's vendor registration on PlanetBids — to be listed as a District supplier and receive automated notifications of upcoming bids and RFPs. You can browse current opportunities any time on the bid opportunities board.
What's the difference between the Supplier Portal and PlanetBids?
The Supplier Portal qualifies your business to do work with the District (used for invoicing, payment, and contract administration). PlanetBids surfaces specific bid and RFP opportunities. Both registrations are recommended.
Does Peralta have a small business program?
Yes. The District has a 25% Small Local Business Enterprise (SLBE) utilization provision on bond-funded contracts. Bidding preferences are determined on a contract-by-contract basis — the preference is used only to compute the winning bidder; the contract is awarded at the actual bid amount. See Board Policy BP 6356 and Administrative Procedure AP 6356.
Is there a Project Labor Agreement (PLA)?
Yes. The District uses a PLA on eligible bond-funded capital improvement projects to support high-quality construction delivery, labor stability, and workforce development across PLA-covered work. The PLA coordinates workforce participation through building and construction trades pathways, established systems, and state-recognized training programs — including the Laney College Multi-Craft Core Curriculum (MC3) program established in 2025. The PLA document is available in the Work with Us section, along with the 2024 5-year extension.

Oversight & accountability

What does the CBOC do exactly?
The Citizens' Bond Oversight Committee reviews Measure G expenditures, ensures compliance with the bond's authorizing language, and publishes annual reports. The CBOC operates independently of the District organization, although members are appointed by the Board of Trustees. For agendas, minutes, and reports, visit peralta.edu/cboc.
Where can I see the annual audit?
All annual financial audits and CBOC annual reports are posted under Reports & audits.
How can I attend a Board or CBOC meeting?
CBOC meeting agendas, minutes, and schedules are posted on the District CBOC site. Board of Trustees meetings are posted to BoardDocs and streamed publicly.

Community

How do I report a construction-related concern?
For safety concerns on campus, contact campus security through the relevant college's safety office. For non-emergency concerns or general questions about the Measure G program, email buildperalta@peralta.edu or call PCCD at (510) 587-7828.
How can I stay informed about the program?
Subscribe to updates on the News & Updates page, follow Build Peralta on social media (links in the footer), and check the Events & calendar section of the News & Updates page for upcoming public meetings.

Project detail

Project

← All projects · View on program schedule · Bond list

Status
FundingPer the Board-approved bond list
Measure G budgetApril 14, 2026 bond list
Expended

Figures are Measure G expenditures inception through March 31, 2026. Team reflects firms under contract on the project.

Admin · Internal use

Archived content

Retired pages and materials kept in full for reference. This section is not linked anywhere on the public site and is reachable only by direct admin URL.

Website admins only. The items below have been removed from public navigation but retained intact. Bookmark this page — it is intentionally not linked from the site's navigation (its address is buildperalta.org/archive). To bring an item back, re-add its link to the relevant page or menu.

Build Peralta Academy

Nine-session small-business bootcamp · 13 archived session topics listed; presentation files pending restore · Archived June 2026

View archived page →

More archived items will appear here as content is retired.